AMPYR in partnership with Gryphon Energy are developing the Rutherglen Battery near Bororen, to provide the Gladstone region with stable, reliable energy and storage capability during peak times.
The battery will strengthen grid reliability in Central Queensland, directly supporting the Queensland Government’s Energy Roadmap which calls for at least 3.1 GW of battery storage by 2030.
In October 2026, Gryphon Energy (as Red Hill Renewable Energy) submitted a revised Development Application for the project to the State Assessment Referral Agency (SARA). The key studies and assessments part of the Development Application are publicly available via the SARA website in the application and decision material section, under the reference number 2609-54713 SDA. They can also be found further down in our project approval documentation section.
The application will be publicly exhibited on the SARA submissions portal following the statutory notification period.
400 MW
1,600 MWh battery size
235000
homes powered during peak demand periods when renewables are not producing
> 150
full-time equivalent jobs generated across the whole Construction Phase
Project Status
Location
Rutherglen Battery is located off Red Hill Road, around 6 km east of Bororen. It lies 47 km south of Gladstone, in the Gladstone Regional Council LGA.
Rutherglen Battery will sit on a 23-hectare development site, within a 1,277-hectare lot. The development site includes the battery and inverter containers, a 33/275kV substation, and a 275kV switchyard via which the project will connect to the existing 275kV transmission line F814. Powerlink will operate and maintain the switchyard as an integral part of their Queensland transmission network.
Empowering Australia’s First Nations
AMPYR and Gryphon Energy are committed to partnering with local First Nations communities to respect culture and Country, support local jobs, business and training, and deliver legacy benefits for the community.
AMPYR intends to seek a formal benefit-sharing partnership with the Port Curtis Coral Coast (PCCC) peoples to deliver significant support for First Nations peoples of the area, over the life of the project. Equity stakes in AMPYR projects can deliver 20+ year revenues and support First Nations economic empowerment and self-determination.
Project documentation
Project approval documentation
- Attachment 1 - Compiled Proposal Plans
- Attachment 2 - CT and CLR
- Attachment 3a - SARA Prelodgement Meeting Minutes
- Attachment 3b - Prelodgement Meeting Advice
- Attachment 4 - Ecological Assessment Report - 4 Elements
- Attachment 5a - Risk Management Assessment - Consequence Analysis - Arriscar
- Attachment 5b - Risk Management Assessment - Fire Safety - Arriscar
- Attachment 6 - Stormwater Management - WMS
- Attachment 7a - OSOM Construction Concept Strategy - PTT
- Attachment 7b - Traffic Impact Assessment - PTT
- Attachment 8 - Cultural Heritage Search
- Attachment 9 - SIA
- Attachment 10 - Noise Impact Assessment Report - Matrix Acoustics
- Attachment 11 - Bushfire Assessment - Eldon Bottcher
- Attachment 12 - MSES Report
- Attachment 13 - Wetland Mapping
- Attachment 14 - State Code 27 Response
- Attachment 15 - Powerlink and Ergon Responses
- Attachment 16 - Infrastructure and Mining Reports
- Attachment 17 - CBA - Red Hill Renewable Energy Pty Ltd
- Attachment 18 - Agricultural Assessment - Gilbert and Sutherland
- Attachment 19 - Visual Assessment
- Attachment 20 - Letter from the Minister RE AM
- Attachment 21 - 20260326 EPBC Decision Notice
- Attachment 22 - Prelim Geotechnical Report - Butler Partners
- Attachment 23 - Decommissioning Report
- Attachment 24 - Community and Stakeholder Engagement Plan
- Application Summary
- Planning Report
- Confirmation Notice